Is Borrower Required to Sign Updated Version of Closing Disclosure?

October 9, 2015

The short answer is that it depends on the lender. So, settlement agents should read their closing instructions carefully. Generally, when a disclosure becomes inaccurate within three days before consummation and a new three day period is not required, TRID requires the lender to correct the disclosure and ensure the consumers receives the disclosure at or before closing. 12 CFR 1026.19(f)(2)(i).

Each lender will have different requirements for how they will want to correct disclosures, the timing for sending them to consumers and the documentation they will require for compliance purposes.

It is a safe bet that if the lender requires some documentation of receipt for the original Closing Disclosure, they will likely require the same protocol for corrected disclosures.